Title 40 -- Protection of Environment

Home 29 CFR 40 CFR 49 CFR Federal  Register MSDS Search Purchase CFR e-Books

 

Previous Home Next


 

§792.31 Testing facility management.

For each study, testing facility management shall:

(a) Designate a study director as described in §792.33 before the study is initiated.

(b) Replace the study director promptly if it becomes necessary to do so during the conduct of a study.

(c) Assure that there is a quality assurance unit as described in §792.35.

(d) Assure that test, control, and reference substances or mixtures have been appropriately tested for identity, strength, purity, stability, and uniformity, as applicable.

(e) Assure that personnel, resources, facilities, equipment, materials and methodologies are available as scheduled.

(f) Assure that personnel clearly understand the functions they are to perform.

(g) Assure that any deviations from these regulations reported by the quality assurance unit are communicated to the study director and corrective actions are taken and documented.


Previous Home Next