|
||||||
|---|---|---|---|---|---|---|
| Home | 29 CFR: 1910 or 1926 | 40 CFR | 49 CFR | Federal Register | MSDS Search | Purchase CFR e-Books |
If, within a pipeline system, two or more components are to be connected at a place where one will operate at a higher pressure than another, the system must be designed so that any component operating at the lower pressure will not be overstressed.