|
Title 49--Transportation
CHAPTER I--RESEARCH AND SPECIAL PROGRAMS ADMINISTRATION, DEPARTMENT OF TRANSPORTATION
PART 192--TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS
|
|
|
Incorporation by reference.
| |
|
|
|
Outer continental shelf pipelines.
| |
|
|
|
Conversion to service subject to this part.
| |
|
|
|
Rules of regulatory construction.
| |
|
|
|
Design formula for steel pipe.
| |
|
|
|
Yield strength (S) for steel pipe.
| |
|
|
|
Nominal wall thickness (t) for steel pipe.
| |
|
|
|
Design factor (F) for steel pipe.
| |
|
|
|
Longitudinal joint factor (E) for steel pipe.
| |
|
|
|
Temperature derating factor (T) for steel pipe.
| |
|
|
|
Design limitations for plastic pipe.
| |
|
|
|
Qualifying metallic components.
| |
|
|
|
Flanges and flange accessories.
| |
|
|
|
Passage of internal inspection devices.
| |
|
|
|
Components fabricated by welding.
| |
|
|
|
Welded branch connections.
| |
|
|
|
Compressor stations: Design and construction.
| |
|
|
|
Compressor stations: Liquid removal.
| |
|
|
|
Compressor stations: Emergency shutdown.
| |
|
|
|
Compressor stations: Pressure limiting devices.
| |
|
|
|
Compressor stations: Additional safety equipment.
| |
|
|
|
Compressor stations: Ventilation.
| |
|
|
|
Pipe-type and bottle-type holders.
| |
|
|
|
Additional provisions for bottle-type holders.
| |
|
|
|
Transmission line valves.
| |
|
|
|
Distribution line valves.
| |
|
|
|
Vaults: Structural design requirements.
| |
|
|
|
Vaults: Sealing, venting, and ventilation.
| |
|
|
|
Vaults: Drainage and waterproofing.
| |
|
|
|
Design pressure of plastic fittings.
| |
|
|
|
Valve installation in plastic pipe.
| |
|
|
|
Protection against accidental overpressuring.
| |
|
|
|
Control of the pressure of gas delivered from high-pressure distribution systems.
| |
|
|
|
Requirements for design of pressure relief and limiting devices.
| |
|
|
|
Required capacity of pressure relieving and limiting stations.
| |
|
|
|
Instrument, control, and sampling pipe and components.
| |
|
|
|
Qualification of welders.
| |
|
|
|
Inspection and test of welds.
| |
|
|
|
Repair or removal of defects.
| |
|
|
|
Plastic pipe: qualifying joining procedures.
| |
|
|
|
Plastic pipe: qualifying persons to make joints.
| |
|
|
|
Plastic pipe: inspection of joints.
| |
|
|
|
Compliance with specifications or standards.
| |
|
|
|
Wrinkle bends in steel pipe.
| |
|
|
|
Installation of pipe in a ditch.
| |
|
|
|
Installation of plastic pipe.
| |
|
|
|
Customer meters and regulators: Location.
| |
|
|
|
Customer meters and regulators: Protection from damage.
| |
|
|
|
Customer meters and regulators: Installation.
| |
|
|
|
Customer meter installations: Operating pressure.
| |
|
|
|
Service lines: Installation.
| |
|
|
|
Service lines: Valve requirements.
| |
|
|
|
Service lines: Location of valves.
| |
|
|
|
Service lines: General requirements for connections to main piping.
| |
|
|
|
Service lines: Connections to cast iron or ductile iron mains.
| |
|
|
|
Service lines: Cast iron and ductile iron.
| |
|
|
|
New service lines not in use.
| |
|
|
|
Service lines: Excess flow valve performance standards.
| |
|
|
|
Excess flow valve customer notification.
| |
|
|
|
Applicability to converted pipelines.
| |
|
|
|
External corrosion control: Buried or submerged pipelines installed after July 31, 1971.
| |
|
|
|
External corrosion control: Buried or submerged pipelines installed before August 1, 1971.
| |
|
|
|
External corrosion control: Examination of buried pipeline when exposed.
| |
|
|
|
External corrosion control: Protective coating.
| |
|
|
|
External corrosion control: Cathodic protection.
| |
|
|
|
External corrosion control: Monitoring.
| |
|
|
|
External corrosion control: Electrical isolation.
| |
|
|
|
External corrosion control: Test stations.
| |
|
|
|
External corrosion control: Test leads.
| |
|
|
|
External corrosion control: Interference currents.
| |
|
|
|
Internal corrosion control: General.
| |
|
|
|
Internal corrosion control: Monitoring.
| |
|
|
|
Atmospheric corrosion control: General.
| |
|
|
|
Atmospheric corrosion control: Monitoring.
| |
|
|
|
Remedial measures: General.
| |
|
|
|
Remedial measures: Transmission lines.
| |
|
|
|
Remedial measures: Distribution lines other than cast iron or ductile iron lines.
| |
|
|
|
Remedial measures: Cast iron and ductile iron pipelines.
| |
|
|
|
Corrosion control records.
| |
|
|
|
Strength test requirements for steel pipeline to operate at a hoop stress of 30 percent or more of SMYS.
| |
|
|
|
Test requirements for pipelines to operate at a hoop stress less than 30 percent of SMYS and at or above 100 p.s.i. (689 kPa) gage.
| |
|
|
|
Test requirements for pipelines to operate below 100 p.s.i. (689 kPa) gage.
| |
|
|
|
Test requirements for service lines.
| |
|
|
|
Test requirements for plastic pipelines.
| |
|
|
|
Environmental protection and safety requirements.
| |
|
|
|
Uprating to a pressure that will produce a hoop stress of 30 percent or more of SMYS in steel pipelines.
| |
|
|
|
Uprating: Steel pipelines to a pressure that will produce a hoop stress less than 30 percent of SMYS: plastic, cast iron, and ductile iron pipelines.
| |
|
|
|
Procedural manual for operations, maintenance, and emergencies.
| |
|
|
|
Change in class location: Required study.
| |
|
|
|
Change in class location: Confirmation or revision of maximum allowable operating pressure.
| |
|
|
|
Underwater inspection and re-burial of pipelines in the Gulf of Mexico and its inlets.
| |
|
|
|
Damage prevention program.
| |
|
|
|
Investigation of failures.
| |
|
|
|
Maximum allowable operating pressure: Steel or plastic pipelines.
| |
|
|
|
Maximum allowable operating pressure: High-pressure distribution systems.
| |
|
|
|
Maximum and minimum allowable operating pressure; Low-pressure distribution systems.
| |
|
|
|
Tapping pipelines under pressure.
| |
|
|
|
Transmission lines: Patrolling.
| |
|
|
|
Transmission lines: Leakage surveys.
| |
|
|
|
Line markers for mains and transmission lines.
| |
|
|
|
Transmission lines: Record keeping.
| |
|
|
|
Transmission lines: General requirements for repair procedures.
| |
|
|
|
Transmission lines: Permanent field repair of imperfections and damages.
| |
|
|
|
Transmission lines: Permanent field repair of welds.
| |
|
|
|
Transmission lines: Permanent field repair of leaks.
| |
|
|
|
Transmission lines: Testing of repairs.
| |
|
|
|
Distribution systems: Patrolling.
| |
|
|
|
Distribution systems: Leakage surveys.
| |
|
|
|
Test requirements for reinstating service lines.
| |
|
|
|
Abandonment or deactivation of facilities.
| |
|
|
|
Compressor stations: Inspection and testing of relief devices.
| |
|
|
|
Compressor stations: Storage of combustible materials.
| |
|
|
|
Compressor stations: Gas detection.
| |
|
|
|
Pressure limiting and regulating stations: Inspection and testing.
| |
|
|
|
Pressure limiting and regulating stations: Telemetering or recording gauges.
| |
|
|
|
Pressure limiting and regulating stations: Testing of relief devices.
| |
|
|
|
Valve maintenance: Transmission lines.
| |
|
|
|
Valve maintenance: Distribution systems.
| |
|
|
|
Prevention of accidental ignition.
| |
|
|
|
Caulked bell and spigot joints.
| |
|
|
|
Protecting cast-iron pipelines.
| |
|